MCBS
  • CONTACT US
  • PARTNERSHIP
  • Partner with us
  • Download
  • REFERENCES
  • Healthcare
  • SOLUTIONS
  • Healthcare
  • Office building
  • Retailing
  • Library
  • PRODUCTS
  • Automated Track Vehicle System
  • Pneumatic Tube System
  • Vertical Conveyor Transport System
  • Automated Waste Transport System
  • Yunnan province Kunming No.4 people hospital
    By: admin    Date: 2018-10-18

                                                                     


    Project difficulty: 


    1. Some reserved vertical shaft positions are not consistent.

    2. New and old buildings have different horizontal elevations,There is a horizontal difference between tracks.




    Solution


    Customized solutions about steering track and Irregular bending track. It is a very mature solution to the environmental characteristics of the large terrain fall between the buildings in the southwest region.



    昆钢医院案例1.jpg

    昆钢医院案例3.jpg

    昆钢医院案例4.jpg

    昆钢医院案例2.jpg

    Copyright © 2018 Manchebisi High Tech Co.,Ltd. All Rights Reserved.
    Add:No.15 China-Asean Business Park(Phase II) Nanning,China.
    86 13659617556