MCBS
  • CONTACT US
  • PARTNERSHIP
  • Partner with us
  • Download
  • REFERENCES
  • Healthcare
  • SOLUTIONS
  • Healthcare
  • Office building
  • Retailing
  • Library
  • PRODUCTS
  • Automated Track Vehicle System
  • Pneumatic Tube System
  • Vertical Conveyor Transport System
  • Automated Waste Transport System
  • Fujian province Fuding hospital
    By: admin    Date: 2018-10-18


    福建省福鼎市医院.jpg

    Project difficulty


    1.  Because of the small reserved space of vertical shafthuge challenge for the difficulty of system installation.


    2. Track placement has special requirement of location installation.


    Solution:


    1. Adjusted the size of floor opening and the location of sectional folding trackno need to change the size of vertical shaft.


           2.Customized solutions base on hospital needs.



    Copyright © 2018 Manchebisi High Tech Co.,Ltd. All Rights Reserved.
    Add:No.15 China-Asean Business Park(Phase II) Nanning,China.
    86 13659617556